Dogfennau a Gyhoeddwyd Fesul Cam

Cyn cais (8)

Cais y datblygwr (50)

Derbyn (2)

Cyn archwiliad (20)

Archwiliad (117)

Penderfyniad (30)

Penderfywyd (29)

Dyddiad

SourceDescription
Other
Maint: 65 KB
Non Material Change 2 Amendment Order
Other
Maint: 3 MB
Welsh Government Non Material Change 2 Decision letter
Other
Maint: 160 KB
Natural Resources Wales
Response to application for a second non-material change to the development consent order
Other
Maint: 170 KB
Rhondda Cynon Taf County Borough Council - Highway Development Control
Response to application for a second non-material change to the development consent order
Other
Maint: 35 KB
Rhondda Cynon Taf County Borough Council
Response to application for a second non-material change to the development consent order
Other
Maint: 43 KB
Brecon Beacons National Park
Response to application for a second non-material change to the development consent order
Other
Maint: 2 MB
Hirwaun Power Limited
Non Material Change Application 2 - Consultation Statement
Other
Maint: 2 MB
Hirwaun Power Limited
Non Material Change Application 2 - Main Statement
Other
Maint: 133 KB
Hirwaun Power Limited
Non Material Change Application 2 - Reg 6 Notice
Other
Maint: 104 KB
Hirwaun Power Limited
Non Material Change Application 2 - Draft Order
Other
Maint: 137 KB
Hirwaun Power Limited
Request for written consent from the Secretary of State for a targeted list of consultees, pursuant to Regulation 7(3) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 (as amended)
Other
Maint: 276 KB
Welsh Government
Response from the Welsh Ministers in relation to the request for a targeted list of consultees, pursuant to Regulation 7(3) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 (as amended)
Other
Maint: 116 KB
The Hirwaun Generating Station (Amendment) Order 2016
Other
Maint: 184 KB
Hirwaun Non-Material Change Application Decision Letter dated 11 November 2016
Other
Maint: 2 MB
Hirwaun Power Limited
Regulation 7A Notice
Other
Maint: 484 KB
Neath Port Talbot County Borough Council
Late response to Hirwaun Power Limited's application for a non-material change to the development consent order
Other
Maint: 183 KB
Cwm Taf University Health Board
Late response to Hirwaun Power Limited's application for a non-material change to the development consent order
Other
Maint: 436 KB
Welsh Government
Hirwaun Power Limited’s application for a non-material change to the development consent order
Other
Maint: 204 KB
Rhondda Cynon Taf County Borough Council
Response to Hirwaun Power Limited’s application for a non-material change to the development consent order
Other
Maint: 2 MB
Brecon Beacons National Park Authority
Response to Hirwaun Power Limited's application for a non-material change to the development consent order
Other
Maint: 235 KB
Natural Resources Wales
Response to Hirwaun Power Limited's application for a non-material change to the development consent order
Other
Maint: 4 MB
Hirwaun Power Limited
Revised Works Plans Revision 4
Other
Maint: 3 MB
Hirwaun Power Limited
Non Material Change Application
Other
Maint: 360 KB
Hirwaun Power Limited
Draft Amendment Order
Other
Maint: 342 KB
Hirwaun Power Limited
Regulation 6 Notice
Other
Maint: 234 KB
Hirwaun Power Limited
Application Covering Letter
Other
Maint: 34 KB
Joint feedback meeting for Hirwaun and Progress Power examinations
Other
Maint: 29 KB
The Hirwaun Generating Station Correction Order 2015
Issued by the Secretary of State 21 December 2015
Other
Maint: 48 KB
Hirwaun Correction Notice
Issued by the Secretary of State 21 December 2015
Other
Maint: 108 KB
The Planning Inspectorate's Notice of the Decision by the Secretary of State
The Secretary of State for Energy and Climate Change?s Decision Letter and Statement of Reasons, dated 23 July 2015
Other
Maint: 11 MB
Post Examination Correspondence
Correspondence received during the recommendation stage
Other
Maint: 402 KB
Development Consent Order as made by the Secretary of State
Development Consent Order as made by the Secretary of State on 23 July 2015
Other
Maint: 4 MB
Secretary of State Decision Letter and Statement of Reasons
Decision made by the Secretary of State for Energy and Climate Change, dated 23 July 2015
Other
Maint: 2 MB
Other
Maint: 208 KB
Welsh Government
Welsh Government?s response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 503 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Legal Opinion on compulsory acquisition powers, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 152 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
A schedule explaining the changes in Rev. 7 of the draft DCO, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 7 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Letter from Rhondda Cynon Taf County Borough Council dated 24 June 2015, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 633 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Comparison of Revision 7 of the draft Development Consent Order against Revision 6, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 2 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Works Plans ? Rev. 3 (to be used with Rev. 8 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 315 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Schedule of formatting changes to Rev. 6 of the draft DCO (Jan 2015), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 3 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Land Plans ? Rev. 2 (to be used with Rev. 7 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 1 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Access / Rights of Way Plans ? Rev. 2 (to be used with Rev. 7 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 3 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Land Plans ? Rev. 3 (to be used with Rev. 8 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 33 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Legal Opinion on jurisdiction in respect of the gas and electrical connections, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 2 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Works Plans ? Rev. 2 (to be used with Rev. 7 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 2 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Works Plans ? Rev. 1 (to be used with Rev. 6 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 10 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Section 135 consent from the Welsh Government, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 1 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Access / Rights of Way Plans ? Rev. 3 (to be used with Rev. 8 of the draft DCO), received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 657 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Comparison of Revision 8 of the draft Development Consent Order against Revision 6, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 636 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Draft Development Consent Order Revision 7.0, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 1 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Draft Development Consent Order Revision 8.0, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 2 MB
Pinsent Masons LLP ar ran Hirwaun Power Limited
Applicant?s response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 189 KB
Pinsent Masons LLP ar ran Hirwaun Power Limited
A schedule explaining the changes in Rev. 8 of the draft DCO, received in response to the request for comments by the Department of Energy and Climate Change in their letter dated 8 June 2015
Other
Maint: 44 KB
Department of Energy and Climate Change
Extension to the deadline for comments following DECC's consultation letter of 8 June 2015
Other
Maint: 48 KB
DECC Consultation Letter
Other
Maint: 958 KB
Natural Resources Wales
Comments on draft planning obligation. Received before the close of examination 23 January 2015
Other
Maint: 47 KB
Hirwaun Power Limited
Statement from the Applicant confirming status of s.106 agreement. Received before the close of examination 23 January 2015
Other
Maint: 67 KB
Notification of Completion of ExA Examination
Other
Maint: 140 KB
Hirwaun Power Limited
4.3 Book of Reference (Revision 2.0). This was initially published as part of an Additional Submission at Deadline 3
Other
Maint: 65 KB
Nick Sharp ar ran Natural Resources Wales
Statement from Natural Resources Wales confirming status of Blaen Cynon SAC Core Management Plan and draft s106 agreement
Other
Maint: 908 KB
Hirwaun Power Limited
Draft Development Consent Order Revision 6.0
Other
Maint: 569 KB
Hirwaun Power Limited
Comparison of Revision 6 of the draft Development Consent Order against Revision 5
Other
Maint: 5 MB
Hirwaun Power Limited
Hirwaun Power Limited?s responses to the Examining Authority?s further written questions, including an engrossed Section 106 Agreement
Other
Maint: 90 KB
Rule 8(3) and 17 letter
Other
Maint: 32 KB
Hirwaun Power Limited
Additional Submission from the Applicant giving an update on progress with the legal agreement with landowners - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 71 KB
Welsh Water
Welsh Water ? confirmation of their agreement regarding the terms of protective provisions with the applicant. Dated 22 December 2014
Other
Maint: 201 KB
Hirwaun Power Limited
Cover Letter for draft Development Consent Order documents, including appendix of amendments, submitted on 22 December 2014 The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 7
Other
Maint: 834 KB
Hirwaun Power Limited
3.1 Revision 5 of the draft Development Consent Order, submitted on 22 December 2014 The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 7
Other
Maint: 1 MB
Hirwaun Power Limited
3.2 Explanatory Memorandum ? Final update version, submitted on 22 December 2014 The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 7
Other
Maint: 1 MB
Hirwaun Power Limited
3.1 Comparison of Revision 5 of the draft Development Consent Order against Revision 4, submitted on 22 December 2014 The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 7
Other
Maint: 363 KB
Hirwaun Power Limited
3.2 Explanatory Memorandum ? Comparison of Revision 1 against Revision 2, submitted on 22 December 2014 The Examining Authority has exercised its discretion and agreed to accept this as a late submission following Deadline 7
Other
Maint: 1,006 KB
Hirwaun Power Limited
Draft Development Consent Order (Revision 0 (Final)) illustrating track changes against Revision 4.0. The Examining Authority has exercised its discretion and agreed to accept this as a late submission
Other
Maint: 140 KB
Hirwaun Power Limited
Book of Reference (Rev 3). The Examining Authority has exercised its discretion and agreed to accept this as a late submission
Other
Maint: 200 KB
Hirwaun Power Limited
Cover letter for supplementary submission at Deadline 7. The Examining Authority has exercised its discretion and agreed to accept this as a late submission
Other
Maint: 798 KB
Hirwaun Power Ltd DCO
Draft DCO Revision 3.0 and 4.0 Comparison
Other
Maint: 814 KB
Hirwaun Power Ltd
Explanatory Memorandum Revision 1.0
Other
Maint: 474 KB
Hirwaun Power Limited Cover Letter Deadline 7
Additional submission received for deadline 7. This includes a cover letter containing Schedule 1: Amendments made in revision 4.0 of the draft DCO, and Schedule 2: A table setting out the current position with each of the statutory undertakers potentially affected by the authorised development. The ExA has exercised its discretion and agreed to accept this submission
Other
Maint: 581 KB
Hirwaun Power Limited Draft DCO
Draft Development Consent Order Revision 4.0
Other
Maint: 2 MB
Hirwaun Power Limited
Land Plans Revision 1
Other
Maint: 49 KB
National Grid
Additional Submission from National Grid -This email includes a request to withdraw all previous representations, under s127 and s138 of the Planning Act 2008. The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Maint: 1 MB
Hirwaun Power Limited
Responses to the ExA's second written questions
Other
Maint: 149 KB
Brecon Beacons National Park Authority
Brecon Beacons National Park Authority's Responses to the ExA's second round of questions
Other
Maint: 24 KB
Rhondda Cynon Taf County Borough Council
Rhondda Cynon Taf County Borough Council's responses to the ExA's second written questions
Other
Maint: 772 KB
Hirwaun Power Limited
Comments on the RIES
Other
Maint: 230 KB
Yohanna Weber ar ran National Grid
Additional submission for Deadline 6. The Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 80 KB
A Morgan Farms
Additional Submission from A Morgan Farms - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 43 KB
Colin Turnbull ar ran Hirwaun Power Limited
Additional submission for Deadline 6 - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 126 KB
Hirwaun Power Limited
Cover letter for Deadline 6. The Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 14 MB
Natural Resources Wales
Natural Resources Wales response to the ExA's second round of questions
Other
Maint: 75 KB
Tower Regeneration Limited
Tower Regeneration's responses to the ExA's second round of questions
Other
Maint: 41 KB
Eunice Davies, Carol Ann Jenkins and Ifan Geraint Jenkins of Ty Draw Farm Rhigos all trading as A. Morgan Farms
Additional submission from Eunice Davies, Carol Ann Jenkins and Ifan Geraint Jenkins of Ty Draw Farm Rhigos all trading as A. Morgan Farms - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 241 KB
Colin Turnbull ar ran Hirwaun Power Limited
Additional submission for Deadline 5 - the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 345 KB
Geldards LLP ar ran Ashtenne Industrial Fund
Additional submission from Geldards LLP on behalf of Ashtenne Ltd ? the Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 111 KB
ExA's second written questions
Other
Maint: 307 KB
141021 EN010059 RIES
Report on Implications for European Sites for Hirwaun Power Station.
Other
Maint: 7 MB
Hirwaun Power Limited
Booklet prepared for attendees of the Accompanied Site Visit 22 September 2014
Other
Maint: 220 KB
Natural Resources Wales
Written summary of the oral representation put at the Issue Specific Hearing on environmental matters held on 24 September 2014
Other
Maint: 2 MB
Brecon Beacons National Park Authority
Joint written summary of oral representations put to multiple hearings
Other
Maint: 331 KB
Hirwaun Power Limited & Brecon Beacons National Park Authority
Statement of Common Ground between the Applicant and Brecon Beacons National Park Authority (Tracked changes version)
Other
Maint: 382 KB
Hirwaun Power Limited and Natural Resources Wales
Statement of Common Ground between the Applicant and Natural Resources Wales
Other
Maint: 227 KB
Tower Regeneration
Additional submission for Deadline 4 (7 October 2014). The Examining Authority has exercised its discretion and agreed to accept this submission. Statement in relation to the latest position between Tower Regeneration and Hirwaun power Limited.
Other
Maint: 154 KB
Hirwaun Power Limited
Additional submission for Deadline 4 (7 October 2014). The Examining Authority has exercised its discretion and agreed to accept this submission. Cover letter for Deadline 4
Other
Maint: 923 KB
Hirwaun Power Limited
Draft Development Consent Order (Revision 3.0). Submitted for Deadline 4 (7 October 2014). Please also see Hirwaun Power Limited?s Cover letter for Deadline 4.
Other
Maint: 147 KB
Natural Resources Wales
Written summary of the oral representation put at the Issue Specific Hearing on the DCO held on 23 September 2014
Other
Maint: 3 MB
Hirwaun Power Limited
Written summary of oral case put at the issue specific hearing on environmental matters. Please note this submission includes the following documents: - ?List of Projects Considered in the Cumulative Assessment within the EIA? - ?Shadow Appropriate Assessment? Please also see Hirwaun Power Limited?s Cover letter for Deadline 4.
Other
Maint: 514 KB
Hirwaun Power Limited
Written summary of oral case put at Compulsory Acquisition hearing. Please also see Hirwaun Power Limited?s Cover letter for Deadline 4.
Other
Maint: 3 MB
Hirwaun Power Limited
Written summary of oral case put at the issue specific hearing on draft DCO. Please note this submission includes the following documents: - ?Mitigation Commitments Register? - ?Position paper: mechanism to ensure plant output of 299MWe will not be exceeded?. Please also see Hirwaun Power Limited?s Cover letter for Deadline 4.
Other
Maint: 4 MB
Hirwaun Power Limited and Brecon Beacons National Park Authority
Statement of Common Ground between the Applicant and Brecon Beacons National Park Authority
Other
Maint: 1 MB
Hirwaun Power Limited
Draft Development Consent Order (Revision 3.0). Submitted for Deadline 4 (7 October 2014). Tracked changes against Revision 2.0. Please also see Hirwaun Power Limited?s Cover letter for Deadline 4.
Other
Maint: 67 MB
Tower Regeneration
Information requested by the ExA at the hearings
Other
Maint: 89 KB
141003 EN070001 Hirwaun Power Station Rule 8(3) and 17 letter
Other
audio recording
Maint: 19 KB
Issue Specifc Hearing Audio. 24 September 2014
Audio recording of the Issue Specific Hearing held on 24 September 2014.
Other
audio recording
Maint: 19 KB
Issue Specific Hearing Audio. 23 September 2014
Audio recording of the Issue Specific Hearing held on 23 September 2014.
Other
audio recording
Maint: 174 MB
Compulsory Acquisition Hearing. 24 September 2014
Audio recording of the Compulsory Acquisition Hearing held on 24 September 2014.
Other
audio recording
Maint: 20 MB
Open Floor Hearing Audio. 22 September 2014
Audio recording of the Open Floor Hearing held on 22 September 2014.
Other
Maint: 773 KB
Chris McGough ar ran Ashtenne Industrial Fund
Response to comments on Written Representation
Other
Maint: 133 KB
BNP Paribas ar ran Royal Mail
Late submission from BNP Paribas Real Estate on behalf of Royal Mail ? Written representation. Received on 16 September 2014. The Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 4 MB
Hirwaun Power Limited
Additional submission for Deadline 3 (16 September 2014). The Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 446 KB
Hirwaun Power Limited
Comments on Brecon Beacons National Park Authority Local Impact Report
Other
Maint: 489 KB
Hirwaun Power Limited
Comments on Rhondda Cynon Taf County Borough Council Local Impact Report
Other
Maint: 170 KB
Preliminary Meeting Note
Note of the Preliminary Meeting held on 23 July 2014
Other
Maint: 700 KB
Hirwaun Power Limited
Draft Development Consent Order (Revision 2.0). Submitted for Deadline 2 (10 September 2014). Tracked changes against Revision 1.0
Other
Maint: 84 KB
Issue specific hearing on draft DCO - Agenda
Issue specific hearing on draft DCO - Agenda - Hearing Agenda 23 September 2014
Other
Maint: 82 KB
Issue specific hearing on environmental matters - Agenda
Issue specific hearing on environmental matters (including Environmental Impact Assessment (EIA) and Habitats Regulations Assessment (HRA) - Hearing Agenda 24 and 25 (if required) September 2014
Other
Maint: 80 KB
Compulsory Acquisition Hearing Agenda
Compulsory acquisition hearing - Hearing Agenda 24 September 2014
Other
Maint: 58 KB
ASV Itinerary Monday 22 September 2014
Other
Maint: 46 MB
Hirwaun Power Limited
Additional submission for Deadline 2 (10 September 2014). The Examining Authority has exercised its discretion and agreed to accept this submission
Other
Maint: 54 KB
Open Floor Hearing Agenda 22 September 2014
Open Floor Hearing Agenda 22 September 2014
Other
Maint: 2 MB
Hirwaun Power Limited
Comments on responses to ExA?s first written questions and Comments on Written Representations
Other
Maint: 738 KB
Hirwaun Power Limited
Draft Development Consent Order (Revision 2.0). Submitted for Deadline 2 (10 September 2014)
Other
Maint: 7 MB
Hirwaun Power Limited
Statement of Common Ground between Hirwaun Power Limited and Rhondda Cynon Taf County Borough Council
Other
Maint: 9 MB
Hirwaun Power Limited
Statement of Common Ground between Hirwaun Power Limited and Brecon Beacons National Park Authority
Other
Maint: 385 KB
Hirwaun Power Limited
Statement of Common Ground between Hirwaun Power Limited and Natural Resources Wales
Other
Maint: 48 KB
Yohanna Weber (Eversheds) ar ran National Grid Gas Plc (NGG)
Comments on Written Representations
Other
Maint: 117 KB
Hirwaun Power Limited
Email requesting direction from the Examining Authority in relation to providing notice of hearings
Other
Maint: 103 KB
Rule 13(6) Letter
Procedural decision to direct the applicant to carry out its duties in accordance with Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2010 (as amended)
Other
Maint: 71 KB
Hirwaun Power Limited
Notice under Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2010 of an open floor hearing, issue specific hearings and a compulsory acquisition hearing
Other
Maint: 110 KB
Hirwaun Power Limited
Welsh language version of notice under Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2010 of an open floor hearing, issue specific hearings and a compulsory acquisition hearing
Other
Maint: 44 KB
Rhondda Cynon Taf County Borough Council
Late submission for Deadline 1 (21 August 2014) - Response to the ExA?s first written questions. Received on 28 August 2014. The Examining Authority has exercised its discretion and agreed to accept this submission.
Other
Maint: 132 KB
Eversheds ar ran National Grid Electricity Transmission Plc
Written representation
Other
Maint: 2 MB
Christopher McGough ar ran Ashtenne Industrial Fund
Written Representation
Other
Maint: 221 KB
Brecon Beacons National Park Authority
Response to the ExA's first written questions
Other
Maint: 236 KB
Margaret Ketteridge ar ran GTC
Written Representation from Margaret Ketteridge (GTC) on behalf of The Gas Transportation Company Ltd, Independent Power Networks Ltd, Quadrant Pipelines Ltd, Independent Pipelines Ltd, GTC Pipelines Ltd, Utility Grid Installations Ltd and The Electricity Network Company Ltd
Other
Maint: 902 KB
Elizabeth Freeman
Written Representation
Other
Maint: 2 MB
Elizabeth Freeman
Submission recommending locations or items for the itinerary for the accompanied site visit
Other
Maint: 155 KB
Eversheds ar ran National Grid Gas Plc
Written representation and response to the ExA?s first written questions
Other
Maint: 37 KB
Charlotte Taylor ar ran Western Power Distribution
Written Representation
Other
Maint: 54 MB
Hirwaun Power Limited
Submission for Deadline 1 (21 August 2014) - Response to the ExA?s first written questions; Comments on relevant representations (including comments on any submissions received prior to the preliminary meeting); Submission recommending locations or items for the itinerary for the accompanied site visit; updated Habitats Regulations Assessment screening matrices
Other
Maint: 72 KB
Network Rail Infrastructure Limited
Written Representation
Other
Maint: 16 KB
Civil Aviation Authority
Written Representation
Other
Maint: 4 MB
Dwr Cymru Cyfyngedig Withdrawn
Written Representation
Other
Maint: 34 KB
Equality and Human Rights Commission
Written Representation
Other
Maint: 1 MB
Natural Resources Wales
Written representation, response to the ExA?s first written questions and comments on submissions received prior to the preliminary meeting
Other
Maint: 60 KB
Fulcrum Pipelines Limited
Written Representation
Other
Maint: 5 MB
Barton Willmore ar ran Tower Regeneration Limited
Response to the ExA's first written questions
Other
Maint: 747 KB
Brecon Beacons National Park Authority
Local Impact Report
Other
Maint: 294 KB
Hirwaun and Penderyn Community Council
Written Representation
Other
Maint: 36 KB
The Coal Authority
Response to the ExA?s first written questions
Other
Maint: 312 KB
The Vale of Glamorgan Council
Correspondence received on 21 August 2014
Other
Maint: 1 MB
Rhondda Cynon Taf County Borough Council
Local Impact Report
Other
Maint: 2 MB
Ministry of Defence
Written Representation
Other
Maint: 701 KB
Hirwaun Power Limited
6.1.1 Environmental Mitigation Roadmap - Signposting document identifying how mitigation proposed in the Environmental Statement has been secured in the draft requirements of the draft DCO
Other
Maint: 735 KB
Hirwaun Power Limited
4.1 Statement of Reasons (Rev 1)
Other
Maint: 775 KB
Hirwaun Power Limited
Letter from Hirwaun Power Limited relating to the arrangements for the Preliminary Meeting and updated documents
Other
Maint: 397 KB
Hirwaun Power Limited
9.1 Grid Connection - Comparison document showing the changes between the Grid Connection Statement, as submitted and the updated Rev 1.
Other
Maint: 6 MB
Hirwaun Power Limited
6.1.0 Environmental Statement Errata ? provides corrections and clarifications to the submitted Environmental Statement
Other
Maint: 536 KB
Hirwaun Power Limited
3.1 Draft Development Consent Order (Rev 1)
Other
Maint: 140 KB
Hirwaun Power Limited
4.3 Book of Reference (Rev 1)
Other
Maint: 1 MB
Hirwaun Power Limited
4.1 Statement of Reasons - Comparison document showing the changes between the Statement of Reasons, as submitted and the updated Rev 1
Other
Maint: 770 KB
Hirwaun Power Limited
3.1 Draft Development Consent Order - Comparison document showing the changes between the Draft Development Consent Order, as submitted and the updated Rev 1
Other
Maint: 183 KB
Hirwaun Power Limited
9.1 Grid Connection Statement (Rev 1)
Other
Maint: 213 KB
Hirwaun Power Limited
Letter from Hirwaun Power Limited in response to the Planning Inspectorates ?section 51? advice following the issue of the acceptance decision
Other
Maint: 297 KB
Examining Authority's First Round of Written Questions
The Examining Authority's First Round of Written Questions accompanying the Rule 8 Letter issued on 28 July 2014.
Other
Maint: 140 KB
Hirwaun Power Limited
4.3 Book of Reference - Comparison document showing the changes between the Book of Reference, as submitted and the updated Rev 1
Other
Maint: 139 KB
Rule 8 Letter
Other
audio recording
Maint: 34 MB
Preliminary Meeting Audio
Audio recording of the Preliminary Meeting held on 23 July 2014.
Other
Maint: 41 KB
The Electricity Network Company Ltd, Utility Grid Installations Ltd, Quadrant Pipelines Ltd, Independent Pipelines Ltd, GTC Pipelines Ltd
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 38 KB
GTC Ltd
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 41 KB
Tower Regeneration Ltd
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 41 KB
Neale Thomas ar ran Hirwaun & Penderyn Community Council
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 62 KB
Energetics UK
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 5 MB
Equality Human Rights
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 6 MB
Ashtenne Industrial Fund
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 38 KB
National Grid Gas Plc and National Grid Electricity Transmission Plc
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 72 KB
Fulcrum Pipelines Ltd
Late representation/correspondence submitted during the pre-examination stage and accepted by the Examining Authority
Other
Maint: 128 KB
Hirwaun Rule 6 Letter
Other
Maint: 33 KB
Cardiff County Council
Adequacy of Consultation Representation from Cardiff County Council
Other
Maint: 156 KB
Neath Port Talbot County Borough Council
Adequacy of Consultation Representation from Neath Port Talbot County Borough Council
Other
Maint: 111 KB
Bridgend County Borough Council
Adequacy of Consultation Representation from Bridgend County Borough Council
Other
Maint: 154 KB
Brecon Beacons National Park Authority
Adequacy of Consultation Representation from Brecon Beacons National Park Authority
Other
Maint: 39 KB
Vale of Glamorgan Council
Adequacy of Consultation representation from Vale of Glamorgan Council
Other
Maint: 57 KB
Merthyr Tydfil County Borough Council
Adequacy of Consultation Representation from Merthyr Tydfil County Borough Council
Other
Maint: 40 KB
Caerphilly County Borough Council
Adequacy of Consultation Representation from Caerphilly County Borough Council
Other
Maint: 17 KB
Rhondda Cynon Taff County Borough Council
Adequacy of Consultation Representation from Rhondda Cynon Taff County Borough Council
Other
Maint: 403 KB
Hirwaun Power Limited
Certificates of Compliance with s.56 and s.59 of the Planning Act 2008 and Regulation 13 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009
Other
Maint: 40 KB
Neale Thomas ar ran Hirwaun and Penderyn Community Council
Late representation submitted during the pre-examination stage and accepted by the Examining Authority?
Other
Maint: 16 MB
Hirwaun Power Limited
6.4.0 Updated Environmental Statement Non-Technical Summary
Other
Maint: 16 MB
Hirwaun Power Limited
6.4.1 Updated Environmental Statement Non-Technical Statement Welsh Translation
Other
Maint: 22 MB
6.2.0 Environmental Statement Appendices - Volume B
Other
Maint: 4 MB
6.2.0 Environmental Statement Appendices - Volume D
Other
Maint: 74 MB
6.2.0 Environmental Statement Appendices - Volume E
Other
Maint: 82 MB
6.2.0 Environmental Statement Appendices - Volume A
Other
Maint: 16 MB
6.4.1 Environmental Statement Non-Technical Summary Welsh Translation
Other
Maint: 11 MB
6.1.0 Environmental Statement
Other
Maint: 16 MB
6.2.0 Environmental Statement Appendices - Volume F
Other
Maint: 16 MB
6.4.0 Environmental Statement Non-Technical Summary
Other
Maint: 38 MB
6.3.0 Environmental Statement Figures - Volume C
Other
Maint: 36 MB
6.3.0 Environmental Statement Figures - Volume B
Other
Maint: 31 MB
6.2.0 Environmental Statement Appendices - Volume C
Other
Maint: 36 MB
6.3.0 Environmental Statement Figures - Volume A
Other
Maint: 447 KB
Hirwaun Power Station s55 Acceptance checklist
Other
Maint: 114 KB
Notification of Decision to Accept Application
Other
Maint: 2 MB
5.2.0 Flood Risk Assessment
Other
Maint: 295 KB
10.3.1 Health Impact Assessment Summary Welsh Translation
Other
Maint: 4 MB
2.2 Land Plans
Other
Maint: 1 MB
5.1.1 Consultation Report Non-Technical Summary
Other
Maint: 606 KB
10.1.1 Planning Statement Executive Summary Welsh Translation
Other
Maint: 6 MB
4.2 Funding Statement
Other
Maint: 541 KB
Other
Maint: 4 MB
2.1 Location and Existing Site Layout Plan
Other
Maint: 347 KB
9.1 Grid Connection Statement
Other
Maint: 2 MB
2.7 Right of Way Streets and Access Plan
Other
Maint: 567 KB
1.1.1 Introduction to the Applicant Welsh Translation
Other
Maint: 321 KB
5.2.1 Flood Risk Assessment Summary Welsh Translation
Other
Maint: 25 MB
7.1 Photomontages
Other
Other
Maint: 53 MB
5.1.3 Consultation Report Appendices
Other
Maint: 2 MB
7.2 Plan Identifying Photomontage Locations and Directions of Photographs
Other
Maint: 3 MB
2.3 Works Plans
Other
Maint: 396 KB
1.1.0 Introduction to the Applicant
Other
Maint: 359 KB
9.2 Gas Connection Statement
Other
Maint: 4 MB
5.5.0 No Significant Effects Report
Other
Maint: 2 MB
Other
Maint: 4 MB
2.4 Indicative Site Layout Plans
Other
Maint: 34 MB
1.3.0 Copies of newspaper notices
Other
Maint: 1 MB
10.1.0 Planning Statement
Other
Maint: 1 MB
4.1 Statement of Reasons
Other
Maint: 4 MB
5.1.0 Consultation Report
Other
Maint: 6 MB
10.3.0 Health Impact Assessment
Other
Maint: 709 KB
3.1 Draft Development Consent Order
Other
Maint: 308 KB
5.4.0 Details of Other Consents and Licences
Other
Maint: 238 KB
7.3 Index of Photographs
Other
Maint: 1 MB
5.1.2 Consultation Report Non-Technical Summary Welsh Translation
Other
Maint: 32 MB
10.2.0 Design and Access Statement
Other
Maint: 140 KB
4.3 Book of Reference
Other
Maint: 1 MB
3.2 Explanatory Memorandum
Other
Maint: 2 MB
1.2.0 Application form
Other
Maint: 43 KB
Hirwaun Replacement Letter to stat cons Reg 9 Notification
Regulation 9 Replacement List
Other
Maint: 51 KB
140117 EN010059 Hirwaun Power Project Replacement Reg 9 List organisations
Replacement Reg 9 List of Organisations (no contact details).
Other
Maint: 251 KB
130626 EN10059 Llyodraeth Cymru Welsh Govt late scoping consultation response
Sacn of hardcopy of document
Other
Maint: 48 KB
130731 EN010059 Hirwaun Transboundary Screening Matrix
Other
Maint: 3 MB
130710 EN10059 Scoping Opinion Hirwaun Power Project
Other
Maint: 229 KB
130705 OFWAT Late Scoping Consultation Response
Other
Maint: 111 KB
130704 NHS Wales Late Scoping Consultation Response
Other
Maint: 8 MB
Hirwaun Power Station Scoping Report
Gellir hidlo dogfennau yn ôl eu dyddiad cyhoeddi neu yn ôl y dyddiad cau sy’n berthnasol iddynt. Cyhoeddir dyddiadau cau yn yr amserlen ar ddechrau’r archwiliad a gellir eu gweld ar dab amserlen yr archwiliad.